« Atlantis returns home | Main | LensAlign Status: Long Ruler Kit »
Tuesday
26May2009

LensAlign Status: Long Ruler Kit - May 29 Status

LensAlign Long Ruler production samples under review (Camera: Lumix ZS3)

All approvals were given last week so that the production of the Long Ruler Kit can finally be finalized (finally! <g>). My apologies for the delays. When we announced the Long Ruler Kit, all *had* been approved, but the pre-production approved samples and the production samples did not match which is what caused the delay. Hopefully all is under control now, with re-engineered production techniques developed by our vendor to assure production to production run stability.

I estimate the shipping of the Long Ruler Kits to be around June 8 15th or before. I will update *this* post if the date changes. Thanks for your patience.

Review:

  • Long Ruler Upgrades to ship June 8 15
  • All LRK upgrades will ship with the Enumerator upgrade (at no charge)
  • Enumerator upgrades will be available ($4.95 processing fee) around the same time frame. An Email with purchase link will be sent to all PRO owners at that time. No added charge for shipping.
  • Current pricing on PRO will be extended until LRKs ship.

Thanks to all.

PrintView Printer Friendly Version

EmailEmail Article to Friend

Reader Comments

There are no comments for this journal entry. To create a new comment, use the form below.

PostPost a New Comment

Enter your information below to add a new comment.

My response is on my own website »
Author Email (optional):
Author URL (optional):
Post:
 
Some HTML allowed: <a href="" title=""> <abbr title=""> <acronym title=""> <b> <blockquote cite=""> <code> <em> <i> <strike> <strong>