LensAlign Long Ruler production samples under review (Camera: Lumix ZS3)
All approvals were given last week so that the production of the Long Ruler Kit can finally be finalized (finally! <g>). My apologies for the delays. When we announced the Long Ruler Kit, all *had* been approved, but the pre-production approved samples and the production samples did not match which is what caused the delay. Hopefully all is under control now, with re-engineered production techniques developed by our vendor to assure production to production run stability.
I estimate the shipping of the Long Ruler Kits to be around June 8 15th or before. I will update *this* post if the date changes. Thanks for your patience.
Review:
Thanks to all.
Based on new (and what we believe to be final) info from our vendor, the LRK ship date has been changed to June 15th as now reflected in the above edited post.
We deeply regret this delay. An email will be sent on Monday to all who have pre-ordered the LRK to confirm this new and hopefully final delay. Thanks for your kind patience.